Hydroelectric Power Bench HYDROLIS - MD1HYDROTW ADD TO OFFER LIST

Hydroelectric Power Bench  HYDROLIS - MD1HYDROTW

Learning objectives

- To study the conversion of hydropower into
electricity
- To determine the yield
- To operate an industrial multi-technology
system

 

Presentation

The HYDROLIS bench replicates a hydroelectric power plant. It is designed to demonstrate and control the generation of electricity using hydropower. The water head can be varied from 10 to 25 m using a pump driven by a variable speed drive. A Twido or M340 PLC is used to manage the control system. The equipment is made by BEMA and marketed by Schneider Electric.

 

Description

Water storage and water head system
- 1 x 150 L (approx.) tank
- 1 stainless steel motor-driven pump
- 1 electrical cabinet with an Altivar 312 variable speed drive on
CAN open bus with protection device
- Hydraulic circuit with drain valve
Hydropower plant
- 1 TURGO turbine with 20 buckets
- 2 water injection nozzles with flow valves
- 1 asynchronous generator with encoder for speed control
- Hydraulic circuit with analog flow and pressure sensors
Electrical cabinet
- 1 user socket
- 1 controllable capacitor bank
- 1 PM750 power meter with 3 CTs
- 1 Twido or M340 PLC with TCP/IP and CANopen
- 1 Magelis XBTGT touchscreen graphic operator dialogue terminal
- 1 voltage regulator (for energy recovery and creation of three-phase supply)
- Components required for correct, safe operation
- PCVUE monitoring of 25 variables
Available as an option
- PCVUE monitoring of 250 variables
- EDF metering solution comprising 2 meters for generation and nonconsumption data

 
 

INFORMATION REQUEST FORM